top of page

Watertown City Council Approves 2027 Wastewater and Solid Waste Rate Adjustments Effective Feb. 1

16 hours ago
5 min read
Aerial view of a wastewater treatment plant with circular settling tanks, a small white building, and sunlit green grounds.
A random water treatment plant that has nothing to do with Watertown, SD whatsoever

Northeast Radio SD News – Watertown, SD - The Watertown City Council voted Monday evening unanimously to approve two separate resolutions amending the city’s wastewater and solid waste rate schedules, with both adjustments taking effect Feb. 1, 2027.


During the Nov. 16 meeting, the council passed Resolution No. 26-46 to adjust municipal sewer rates to meet loan debt coverage requirements for the city’s $60 million wastewater treatment plant project, followed by Resolution No. 26-47, which increases landfill tipping fees by $2 per ton while keeping monthly residential garbage rates unchanged.


Wastewater Rate Schedule (Resolution No. 26-46)

Presenting Resolution No. 26-46, City Manager Alan Stager explained that the wastewater rate adjustment follows an internal cost analysis designed to cover both daily operating expenses and required debt coverage ratios on several large State Revolving Fund (SRF) loans and revenue bonds tied to the city’s $60 million wastewater treatment system upgrades.


Under the amended schedule—which takes effect with January 2027 meter readings for the Feb. 1, 2027, billing—rates will adjust as follows:


·        Regular Residential Sewer User Charge (SE): Increases by 4.6% ($2.05 per month), rising from $44.92 to $46.97 per month per household or living unit. Approximately 90 cents of that increase (with the base rate moving from $20.540 to $21.446) covers operational cost increases, while the remainder satisfies debt surcharges, including SRF Loan #16 increasing from $8.10 to $10.00.

·        Regular Commercial Sewer User Charge (SC): Increases from $44.92 to $46.97 per month for the first 300 cubic feet of sewage discharge, plus $4.36 (up from $4.16) per 100 cubic feet in excess of the first 300 cubic feet.

·        Significant Industrial Users (SI): Increases by 6.5% ($7.14 per month) across the city’s 21 industrial class customers, rising from $109.13 to $116.27 per month for up to 700 cubic feet of discharge (with the base rate moving from $84.750 to $90.746), plus $8.10 (up from $7.69) per 100 cubic feet over 700 cubic feet.

·        Effluent Strength Surcharges: Commercial and industrial customers exceeding standard discharge thresholds will be billed $0.39 per pound (up from $0.38) for biological oxygen demand (B.O.D.) over 200 mg/l, $0.2700 per pound (unchanged) for total suspended solids (T.S.S.) over 250 mg/l, and $1.59 per pound (up from $1.51) for ammonia over 20 mg/l.


Councilman Dan Schutte made the motion to approve Resolution No. 26-46, and Councilman Brent Mohrmann seconded it.


During discussion, Schutte asked staff to confirm whether the increase was the final step in the planned rate phase-in for the $60 million wastewater infrastructure debt rather than a new, unexpected hike. Stager and Chief Financial Officer Kristen Bobzien confirmed that the increase completes the multi-year phase-in for the city’s existing loans.

“Just because the last $25 million loan that we did, it had—I think it was close to $10 was what we were anticipating,” Bobzien said. “So instead of hitting that all in one year, as we were doing this, we just slowly piecemealed it in so that the users weren’t experiencing a jump. But this is it. This gets all of our debt coverage where it needs to be for our last two loans.”

Mohrmann summarized the practical impact for residents and business owners.

“Just for the public’s information, to make it real simple, basically what we’re looking at is approximately about a $2 a month on a private property’s utility bill and about $7 a month on a commercial property utility bill,” Mohrmann said.

The council approved Resolution No. 26-46 on a 6-0 roll call vote.


Solid Waste and Landfill Rate Schedule (Resolution No. 26-47)

Next, the council considered Resolution No. 26-47 amending the rate schedule for the Watertown Regional Landfill and solid waste system effective Feb. 1, 2027.


Stager noted that while the solid waste facility does not carry substantial debt, the city periodically adjusts landfill tipping fees to account for operating expenses and estimated future costs of closing landfill cells.


Under Resolution No. 26-47, the solid waste rate schedule includes the following provisions:

·        Residential Monthly Collection: Remains unchanged at $20.50 per month per household or living unit for regular residential refuse, compost, and recycling.

·        Subtitle D Pit Tipping Fee: Increases by $2.00 per ton, from $60.00 to $62.00 per ton (with a $10.00 minimum charge). Of that fee, $3.00 per ton is allocated to the Landfill Land Acquisition Fund. The surcharge rate for inadequately secured loads increases by $4.00 per ton to a total charge of $124.00 per ton ($30.00 minimum).

·        Asbestos-Containing Materials: Increases by $4.00 per ton, from $120.00 to $124.00 per ton ($75.00 minimum) delivered to the Subtitle D pit. Inadequately secured asbestos loads increase by $8.00 per ton to a total rate of $248.00 per ton ($95.00 minimum).

·        Trees, White Goods, Scrap Metal, and Yard Waste: Remains at $35.00 per ton ($10.00 minimum) for material delivered to the tree and branch, white goods, or scrap metal areas, as well as commercial yard waste ($70.00 per ton with a $30.00 minimum for unsecured loads). Residential yard waste delivered by Watertown residents continues to be accepted at no charge.

Black and red local news promo banner with Northeast Radio SD logo and text: Subscribe Free, Read Daily, Stay Local.

·        Out-of-Area Surcharge: Any Subtitle D materials delivered from outside the established landfill service area are subject to an additional charge of $16.00 per ton.

“I will say even at the $62 a ton, we are one of the lowest facilities in the region in terms of solid waste fees, and we do a pretty good job of managing the solid waste facility from an operating cost standpoint as well,” Stager said.

Schutte moved to approve Resolution No. 26-47, and Mohrmann seconded the motion.

Heuer asked whether residents would still have access to free landfill dumping tied to their utility bills and the annual citywide cleanup. Stager said the city will continue holding the annual citywide cleanup and is also exploring a new system tied to utility bills via a barcode that would give each resident a set allotment of free or reduced-rate dumping at the landfill throughout the year.

“This is just offering some reduced rate or free dumping at the landfill itself to try to alleviate some of the burden on the citywide cleanup and allowing residents an opportunity to not have to hold items for up to an entire year,” Stager said.

Mohrmann also asked how much capacity remains in the landfill’s existing cells before the city needs to excavate new cells on city-owned land to the east. Stager said he did not have the exact timeline on hand, but noted city staff and engineers are evaluating options to stack solid waste higher to maximize the lifespan of the current cells before opening new ones.


The council then voted 6-0 on a roll call vote to approve Resolution No. 26-47.


bottom of page